Ctrl + Build: The Carbon Code 鈥 Why Embodied Emissions Are The Next Big Test For Data Centre Builders
Last Updated Jun 13, 2025

Data centre operators are under pressure to decarbonise 鈥 and operational efficiency is no longer enough. The carbon locked into construction materials is now under the spotlight. For builders, that means new expectations, new workflows and a new kind of accountability on site.
Table of contents
Looking Beyond Operational Emissions
Carbon conversations in the data centre world tend to revolve around operations: cutting consumption, switching to renewables and improving performance.
And with good reason. In Australia, data centres already consume around 5% of total electricity. this to climb to 8% by 2030.
But there鈥檚 a quieter carbon story playing out behind the scenes: the emissions locked in before the servers even arrive.
Steel and concrete 鈥 two of construction鈥檚 most carbon-intensive ingredients 鈥 dominate the emissions profile of a typical data centre. Globally, cement and steel account for .
More than are now setting net zero targets. To achieve them, they must address all sources of emissions 鈥 including those embedded in the construction of buildings.
This puts new expectations on builders and contractors.

Visualisation of components to consider in WLCA for data centres and an approximate breakdown of lifecycle module A-C emissions
Source: , 2022. Illustrative only.
Why Embodied Carbon Matters
Embodied carbon emissions are generated during a building鈥檚 entire lifecycle 鈥 from raw materials extraction to transportation of building products, and from powering construction machinery right through to demolition and disposal.
The that 38% of global emissions come from our buildings. Operational emissions account for 29%. The remaining 11% are generated during design, delivery or demolition.
As Australia鈥檚 electricity grid decarbonises and more buildings are powered by 100% renewable electricity, the proportion of emissions created during construction will grow. The says as much as 85% of Australia鈥檚 built environment emissions will be 鈥渓ocked in鈥 before anyone steps through a door 鈥 or switches on a server.

Embodied Carbon Sources Across the Building Lifecycle
Hidden Emissions, Big Impact
When it comes to data centre construction, one big source of emissions stands out: concrete. of a data centre鈥檚 embodied carbon emissions.
According to analysis by global architecture firm Gensler, reducing the amount of concrete used in a data centre through efficient structural design is the single most effective strategy. This is followed by material quality. High-performance aggregates and optimised mix designs can reduce the amount of cement needed.
But here鈥檚 the kicker. Gensler鈥檚 analysis suggests many of the emissions linked to supply, transport and rework aren鈥檛 captured 鈥 because they aren鈥檛 tracked.
Everyone鈥檚 focused on kilowatts. But before the first server goes in, you鈥檝e already locked in tonnes of CO鈧. That comes with reputational and regulatory risk.
Paul Acker
Cracking the Carbon Code
Some project teams are already embedding embodied carbon tracking into digital workflows. Using 海角大神, they can:
- Benchmark embodied carbon for materials and major plant
- Coordinate delivery schedules to align with lower-carbon material availability
- Report embodied carbon metrics alongside traditional quality and cost data.
The goal? A single source of truth and a clear audit trail for data centre operators under pressure to prove their ESG performance.
Table 1: Who Holds the Key to Embodied Carbon?
Stakeholder | Key Responsibility | Embodied Carbon Opportunity | How 海角大神 Helps |
---|---|---|---|
Developers and Owners | Set targets and carbon goals | Establish whole-of-project carbon benchmarks | Centralised platform for setting, sharing and tracking targets |
Designers and Engineers | Specify structure, materials and performance standards | Optimise for low-carbon, efficient design, and EPDs | Embed carbon metrics into design reviews and tender documentation |
Contractors and Builders | Procure materials, manage trades and quality assurance | Reduce rework, track product emissions, align with low-carbon materials | Quality assurance templates linked to emissions benchmarks and install data |
Suppliers | Deliver certified low-carbon materials | Provide EPDs, innovate | Upload data, certifications and delivery information to platform |
Sustainability Consultants | Monitor progress and report against benchmarks | Verify Scope 3 and lifecycle emissions, support ratings submissions | Export carbon data for NABERS, Green Star or custom reports |
Key Takeaways
- Embodied carbon is the next emissions frontier in data centre delivery
- Constructors and contractors will be expected to track and reduce construction-phase emissions
- Structured digital workflows are essential to capture and report embodied carbon
- 海角大神 enables carbon visibility across materials, trades and timelines.
As data centre operators face growing pressure to limit embodied carbon, constructors and contractors who deliver clarity and accountability through data will earn trust 鈥 and win work.
See what鈥檚 coming in construction over the next decade.
Download the Future State of Construction Report for insights, trends, and innovations shaping the industry over the next 8鈥10 years.

this is part of the series
Ctrl + Build
Categories:
Tags:
Written by
Paul Acker
As a Strategic Product Consultant at 海角大神, Paul Acker boosts construction financials through expert 海角大神 implementation and ERP integrations. He translates complex technical and financial problems into practical solutions, improving cash flow, reporting, and project margins for construction firms, developers, and subcontractors. Paul's blend of construction management, financial optimisation, and an MBA - backed by success leading multi-billion dollar system and data migrations - ensures technology delivers tangible commercial results and drives efficiency.
View profileExplore more helpful resources

Construction Logistics 101: Planning, Coordination, and On-Site Efficiency
Strong logistics planning plays a critical role in delivering safe, efficient, and cost-controlled builds鈥攅specially as projects grow more complex and client expectations rise. Well-planned logistics improves coordination and helps teams...

Understanding Construction Milestones: What They Are and Why They Matter
Construction milestones help drive timely, cost-effective project delivery in commercial builds. They bring structure to complex construction programs, support accountability, and enable better planning and coordination across teams. When milestones...

What Happens Post Construction? A Guide to Final Stages and Handover
Construction work may be finished, but the project is not complete. The post-construction phase is a critical transition period where compliance, client satisfaction, and long-term outcomes are either secured or...