Construction Purchase Orders Explained

By

Last Updated Jan 24, 2025

By
2 contractors wearing PPE at construction site surveying amount of concrete needed for concrete pour

A construction purchase order is a key financial element of a project contract. A purchase order (PO) is typically validated by two parties: the buyer and seller. In construction, for example, the owner or general contractor (the buyer) issues a PO to the general contractor or specialty contractor (the seller) to cover the cost of the project.

The document outlines the price and quantity of goods or services necessary to complete the project contract as agreed upon by both parties.

Table of contents

What Information Does a Construction Purchase Order Contain?

In order to illustrate the contents of a construction purchase order and how they are relevant to the completion of a project, let鈥檚 use a hypothetical scenario featuring Jane and John. Let鈥檚 say Jane is a project manager at a GC hired to build a warehouse while John is a concrete contractor who won the bid to pour the foundation of that warehouse.

Description of Deliverables

Upon receiving the bid for the concrete pour, John and his team visit the site. They identify the tools, equipment, materials, and labor needed to complete the project. Once he relays that information to the GC, Jane鈥檚 team will draft a PO for the deliverables outlined by John and his team. 

Number of Deliverables

As Jane鈥檚 team is drafting the PO, they have to be diligent with listing the quantities for each deliverable provided by John. This is important because a PO explicitly states the GC鈥檚 fiscal responsibility for the deliverables needed to complete the work expected of the specialty contractor. This document, therefore, protects both parties by ensuring that:

  • The GC receives the amount and quality of work requested
  • The SC gets paid for the items needed to complete the work requested

Agreed-Upon Cost

As Jane鈥檚 team lays out the itemized list of deliverables requested by John鈥檚 team, the two parties will agree on a cost per item and possible discounts for certain quantities of those items. 

Terms of Payment

The terms of payment for a construction purchase order are usually based on credit. The GC sends the PO to the SC to request a service on credit. This protects the GC in the event that payment is given before the completion of the project. 

The terms of payment can also be set in regards to a net payment term. It defines how many days after an invoice is submitted the buyer has to make the payment. In this scenario, we will say that Jane approves a PO with a net 30 term, which means John will be paid within 30 days of submitting an invoice for the completed work. 

Due Dates

Now that the parties have agreed to the terms of payment, Jane and Johns鈥 teams will decide on due dates for the deliverables requested in the PO. These dates will inform the date of delivery of those deliverables.  

Method of Delivery

One of John鈥檚 deliverables in the PO is an extra concrete mixer that has to be shipped from out of state. The delivery method for that mixer will typically be defined as one of two FOB (Free On Board) shipping terms: FOB Shipping Point (or FOB Origin) and FOB Destination. If 鈥淔OB Origin鈥 is agreed upon, the GC will become responsible for any loss or damages incurred to the mixer as soon as it leaves the warehouse and is in transit to the job site. If 鈥淔OB Destination鈥 is agreed upon, the SC will be responsible for any damage incurred to the mixer until it reaches the job site. 

Reference Numbers

The reference number is one of the most important pieces of the construction purchase order鈥攊t helps track the document. Since a project can have hundreds of PO鈥檚 attached to it, they can commonly become lost or jumbled during a project鈥檚 lifetime. The only way to prove that a service or material was completed or delivered as requested is to be able to locate the respective PO by its reference number.

Purchase Order, Invoice, Contract: What's the difference?

There is one main difference between a purchase order and an invoice in construction. A PO is submitted by the buyer (Jane the GC) to determine the cost of a contract before the work is completed. In contrast,  an invoice is submitted by the seller (John the SC) after the work is completed to receive an agreed-upon payment.

The difference between a purchase order and a contract is that a contract is a legally binding document that covers products, agreed prices, and payment terms, and conditions for the entirety of a construction project. It includes all necessary purchase orders (documents that outline the price and quantity of goods or services necessary to complete the project contract) and invoices.

Key Elements of a Construction PO

A construction purchase order is a key item in a project contract because it鈥檚 a legally binding document that protects both the buyer and seller of a product or service. When drafting a PO, it鈥檚 important to remember to be explicit and detailed when filling out the following sections:

  • Description of deliverables.
  • Number (or quantity) of deliverables.
  • Agreed-upon cost.
  • Terms of payment.
  • Due dates.
  • Method of delivery.
  • Reference Numbers.

Categories:

Contract Management Canada

Tags:

Written by

Harshil Gupta

23 articles

Harshil Gupta is a Product Marketing Manager at 海角大神. Backed by a stint in engineering and rich experience in growth and product marketing, he's enthusiastic about the role of technology in elevating and enabling other industries. He lives in Toronto.

View profile

Explore more helpful resources

article-image

Key Differences Between Contractors & Subcontractors

Few owners and developers employ in-house construction teams. Instead, nearly all construction projects are outsourced to professionals, who work for the owner under a contract. In fact, most construction projects...

article-image

Don鈥檛 Underestimate the Estimator: Key Responsibilities of Construction Estimators

In construction, the estimator鈥檚 role is fundamental to project success. These professionals possess a broad knowledge of building materials, understand the requirements for various construction projects, engage with up-to-date building...

article-image

The Role of Engineering, Procurement, and Construction (EPC) Contractors

Engineering, Procurement and Construction, also known as EPC, refers to a specific type of contracting arrangement or project delivery method that is often used for large-scale infrastructure work, industrial facilities,...

article-image

Infrastructure Construction: Laying Foundations for the Future

Infrastructure allows our society to function physically. It includes all the different systems a community relies on to meet its needs, from roadways and water to communications and waste management....

海角大神 is committed to advancing the construction industry by improving the lives of people working in construction, driving technology innovation, and building a global community of groundbreakers. Our connected global construction platform unites all stakeholders on a project with unlimited access to support and a business model designed for the construction industry.

Call us at (877) 268-2511 to speak with a product expert.

Downloads

  • Privacy Notice
  • Terms of Service

漏 2025 海角大神